Search
Close this search box.

Terminal News

Rubis Terminal Rotterdam Begins Expansion Phase 4

Written by...

Picture of Anamika Talwaria

Anamika Talwaria

Editor & Head of Content for Tank Storage Magazine & StocExpo and Chair of Women in Tanks.

Rubis Terminal Rotterdam (the Netherlands) has begun the expansion of Phase 4 of its project. As per tradition, a coin was tossed in to the first piling, to bring good luck and success to the project.

Phase 4 is planned to be operational in April 2025 and comprises of nine tanks with a total capacity of 28.000 m3. The tank configurations are designed to handle a large variety of petrochemicals, biofuels and other bio and circular products such as pyrolysis oils.

 

Share this article:

Latest terminal news

All News

Vasiliko LNG Terminated

Chinese-led construction firm CPP-Metron Consortium (CMC) has announced that the Vasiliko liquified natural gas (LNG) project in the island of Lefkada, Greece, has been terminated. Cyprus’s Energy Minister George Papanastasiou

Read More
Tank terminal facility with grey skies and smoke
All News

CTS Wins Terminal Contract

CTS has been awarded a major contract for CTS1W-20IT innovative tank seal combinations and Drainmaster equipped drain lines for six new 92 meter diameter external floating roof tanks to be

Read More
white and black ship at dusk
All News

Bechtel Wins Sempra Port Arthur EPC Contract

Sempra Infrastructure, a subsidiary of Sempra, has announced that Port Arthur LNG Phase 2 and Bechtel Energy (Bechtel) have signed a fixed-price engineering, procurement and construction (EPC) contract for the

Read More