Partner News

Crea Construct: Why Choose A Pre-Fab Pump And Valve Room

Written by...

Picture of Anamika Talwaria

Anamika Talwaria

Editor for Tank Storage Magazine & Chair of Women in Tanks

Learn how a Crea Construct prefabricated unit can benefit your terminal   In the petrochemical sector constructing a pump and valve room on site is not always easy. Starting with the first projects in the petrochemical sector, Crea Construct noticed that construction of the pump and valve room on site was not always easy. Often, a lot of valuable time can be lost due to difficult weather conditions, strict safety regulations and coordination with other works in progress. The circumstances on site can also lead to more errors during installation, and therefore more work afterwards.   Efficiency & Precision Crea […]

This post is only available to members. Please login below, or purchase Tank Storage Magazine Subscription – Print & Digital Subscription or Tank Storage Magazine Subscription – Digital Subscription to access this post.

log in

Share this article:

More news

Partner News

EN 14620: Raising The Standard

Dave Ward at Wardz Consulting looks at the revision of EN 14620 and what it means for the tank storage sector EN 14620 is the European Standard that deals with all aspects of the design, construction, testing and commissioning of vertical, cylindrical, tanks for the storage of refrigerated liquified gases (RLG’s). The development history extends back 70 years and the time-line is shown in Figure 02. A full revision of EN14620 was commissioned by CEN (European Committee for Standardisation), in 2015 it is currently managed by Technical Committee CEN TC265/ Working Group10, which Dave Ward convenes. The aim of the […]

This post is only available to members. Please login below, or purchase Tank Storage Magazine Subscription – Print & Digital Subscription or Tank Storage Magazine Subscription – Digital Subscription to access this post.

log in

Read More