Terminal News

Linde Working on Heidelberg Materials Carbon Plant

Written by...

Picture of Anamika Talwaria

Anamika Talwaria

Editor for Tank Storage Magazine & Chair of Women in Tanks
several large storage tanks for petrol in the Rotterdam Port at sunrise

Linde has been working alongside Heidelberg Materials on the CAP2U project – the world’s first large-scale carbon capture and liquefaction facility. Located at Heidelberg’s cement plant in Lengfurt, Germany, the plant has hit some major milestones, Linde announced on LinkedIn.

The 100-tonne absorption and 44-tonne stripper columns were successfully installed, followed by the assembly of four large CO₂ tanks, and the placement of the heat-recovery steam generator. ‘Every one of these moments is a testament to the incredible teamwork that goes into a project of this magnitude,’ Linde says in the post.

With operations slated to begin at the end of 2025, this facility will capture and liquefy 70,000 tonnes of CO₂ annually.

Share this article:

Latest terminal news

Terminal News

Chane partners with UK Peel Ports

The UK’s second largest port operator, Peel Ports Group, has joined forces with liquid bulk storage operator, Chane, whose main UK terminal is located at the port group’s Port of

Read More
Terminal News

Lanzajet brings SAF facility to North Sea Port

LanzaTech, as part of the FLITE (Fuel via Low carbon Integrated Technology from Ethanol) consortium, has selected North Sea Port, Ghent (Belgium), as the site for Europe’s first commercial-scale alcohol-to-jet

Read More