Terminal News

GTT Receives Order For Design Of Two LNG Carriers

Written by...

Picture of Kate Rainford

Kate Rainford

Kate is our editorial assistant at Tank Storage Magazine

GTT has received, in the first quarter of 2025, an order from an Asian shipyard for the tank design of two new liquefied natural gas carriers (LNGCs) on behalf of an Asian ship-owner.

GTT will design the tanks of these two vessels, which will each offer a total capacity of 174,000 m³ and will be fitted with a membrane containment system from the NO96 series developed by GTT.

Deliveries of the vessels are scheduled for the second and third quarters of 2027.

Share this article:

Latest terminal news

Terminal News

Tepsa Expands Capacity in Tarragona

Tepsa Tarragona has officially launched Tank Pit 9, adding 21,000 m³ of new capacity and bringing the terminal’s total to 128,000 m³. In a post on LinkedIn, the company said: ‘Over

Read More