Falcker gets green light from Kiwa Industrial Inspection
The validation was conducted against EEMUA 159 (6th edition, April 2025), the leading standard for inspection and maintenance of aboveground vertical cylindrical steel storage tanks. Kiwa's team tested Falcker's RBI calculations against their own independently developed Mathcad Prime reference model. Falcker's software passed the test, correctly performing and documenting RBI- assessments in full compliance with EEMUA 159.








