Zenith Energy Terminals has signed a memorandum of understanding (MoU) with German e-fuel company, INERATEC to build a power-to-liquid plant in the Port of Amsterdam.
The power-to-liquid factory will convert renewable energy (power) into a sustainable fuel (liquid). The plant has a planned annual production capacity of 35,000 tonnes and will be located on the site of Zenith Energy Terminals. The plant should be operational by 2027.
The collaboration between Zenith Energy Terminals and INERATEC will make use of the existing infrastructure in the Port of Amsterdam and access to green hydrogen and CO2.