Rubis Terminal Rotterdam Begins Expansion Phase 4
Phase 4 is planned to be operational in April 2025 and comprises of nine tanks with a total capacity of 28.000 m3. The tank configurations are designed to handle a large variety of petrochemicals, biofuels and other bio and circular products such as pyrolysis oils.








