Terminal News

TGE Completes First Stage of INEOS Project One

Written by...

Picture of Anamika Talwaria

Anamika Talwaria

Editor for Tank Storage Magazine & Chair of Women in Tanks

TGE has released an update on the construction work at INEOS Project One’s Antwerp, Belgium, site.

TGE is constructing a tank roof for the 197,000 m³ ethylene tank. The tank roof will be covered by a total of 4,000 m³ of concrete. Given its vast size, TGE is applying the concrete in two equal layers – with the first layer having been successfully completed. To support the weight of the wet concrete during this phase, TGE pressurised the tank from the inside until the concrete was sturdy enough to hold its own weight.

The company says: ‘As we speak, we’re gearing up to pour the second layer, which we’ve divided into nine sections to ensure the concrete’s surface is finished to perfection. This task will span several weeks and we’re aiming to wrap it up by the early summer of 2025.’ Once the concrete dome roof is in place, TGE will move to install the top structures, including steel, piping, and electrical works.

Share this article:

Latest terminal news

Terminal News

MOL Group Unveils Blue Action 2035

Mitsui O.S.K. Lines (MOL Group) has launched Phase 2 of its group management plan: ‘BLUE ACTION 2035’ effective April 1. In Phase 2, the focus of group management will shift

Read More
Man and a woman writing on a whiteboard, woman holds laptop
Terminal News

Chevron Changes Senior Leadership Team

Chevron has announced leadership updates that reflect the company’s continued focus on strong operational performance and safety. Chevron has appointed Daniel Woodall as Chief Health, Safety and Environment (HSE) Officer,

Read More